By Timothy and Bryan Jacqmin, co-founders of Nexuro Digital, Official Odoo Partner, Odoo 19 certified · Updated on 26 November 2026
If your database runs on Odoo 19, there is no rush: according to Odoo, this version is supported until September 2028. Move to Odoo 20 when one of its new features really helps you (AI agents run by your automations, MCP connection, new accounting with parent accounts) or when Odoo Online requires it, and always after a test on a copy. If you are still on Odoo 17, whose standard support ended in September 2026, plan the upgrade now. The right moment depends on your hosting, your custom modules and the season of your business.
TL;DR
- Odoo 20 was released in September 2026; Odoo 19 remains supported until September 2028 (date planned by Odoo).
- On Odoo Online, the upgrade is eventually imposed: on Odoo.sh or your own server, you stay in control.
- Custom modules and third-party apps often set the timing, not Odoo itself.
- In every case: test database, module audit, acceptance by your users, then a quiet date.
Odoo 19 or Odoo 20: where do things stand at the end of 2026?
Odoo releases one major version a year, in the autumn, with three years of standard support (fixes and security). Three major versions are therefore supported at the same time: today Odoo 18, 19 and 20. Status according to Odoo's official page, read on 26 November 2026:
| Version | Release | End of standard support | What it means |
|---|---|---|---|
| Odoo 17.0 | November 2023 | September 2026 | Standard support ended: upgrade needed |
| Odoo 18.0 | October 2024 | September 2027 (planned) | Supported, plan it for 2027 |
| Odoo 19.0 | September 2025 | September 2028 (planned) | Supported, no urgency |
| Odoo 20.0 | September 2026 | September 2029 (planned) | Latest major version |
Between two major versions, Odoo Online receives intermediate versions (19.1 to 19.4 in 2026). Paid extended support only exists on Odoo.sh and on your own server, and security updates stop with standard support.
Should you move to Odoo 20 now or stay on Odoo 19?
The table sums up our reading, situation by situation. A single "stay" line is often enough to postpone the upgrade, until the blocker is removed.
| Your situation | Stay on Odoo 19 if… | Move to Odoo 20 if… |
|---|---|---|
| Odoo Online, database on 19.0 | No upgrade notice received and your processes run well | You want a specific new feature, or Odoo has sent the upgrade notice |
| Odoo Online, database on 19.1 to 19.4 | Little choice: the upgrade closely follows the next version | Request a test database now to choose your date before the due date |
| Odoo.sh | Your modules are not ported yet, or your team is busy with another project | A test branch on Odoo 20 passes acceptance without blockers |
| Own server (on-premise) | The server must be updated first | Server, modules and data can be migrated and tested together |
| Custom modules | At least one module has no version compatible with Odoo 20 yet | Each module is ported, replaced by standard Odoo or dropped |
| Studio customisations | You have no time to check your views, reports and automations | Studio is active on your subscription: Odoo's upgrade service covers them |
| Third-party apps (Odoo Apps) | The publisher has not released a 20.0 version of its app | All your third-party apps exist in 20.0 and have been tested |
| Peppol and Belgian localisation | Peppol, VAT and payroll work: Odoo 19 already covers these obligations | A localisation feature specific to Odoo 20 is useful to you |
| AI features | Odoo 19 AI is enough for you, or you have no clear use case yet | You want agents run by your automations or an MCP connection |
| Season of your business | You are in a peak sales, closing or VAT return period | You are entering a quiet period, with your key users available |
First check the exact number of your version: on Odoo Online, a database on 19.0 and a database on 19.3 do not follow the same schedule.
What does Odoo 20 really change for an SME?
According to the official release notes (September 2026), here is what matters for an SME:
- AI agents that create and update records, and that can be called by automated or scheduled actions.
- MCP connection (Model Context Protocol): a standard way to connect AI tools to your database.
- AI credits: every AI feature now needs IAP credits, bought separately.
- Accounting: parent accounts replace account groups, and account codes become optional.
- Simpler access rights: record rules are removed in favour of a domain set on the access right.
- Daily work: offline mode, paying vendor bills from Odoo, pinned messages in the chatter.
On the Belgian side, Odoo 19 already handles Peppol, VAT sent to Intervat and XBRL annual accounts. Details are in our summary of what is new in Odoo 20 and our page Peppol in Odoo.
What can break during the upgrade?
Standard apps are rarely a problem: Odoo handles them. What breaks is around them: a custom module with no compatible version that blocks everything, a custom report that changes layout, an automation that stops running, access rights that show too much or too little. And the website, which lives in the same database, can lose URLs, tags or its conversion tracking.
On Odoo Online, there is no rollback: preparation matters more than the date. For the website, also read keeping your SEO when moving to Odoo 20.
How do you prepare the upgrade to Odoo 20?
The method is the same whatever the hosting:
- Take stock. Exact version, hosting, installed apps, reports and website pages used every day.
- Audit the modules. List every custom module, every Studio customisation and every third-party app, then decide: port, replace with standard Odoo or drop.
- Request a test database. On Odoo Online, from the database manager; on Odoo.sh, on a staging branch. This copy is neutralised: no emails or payments go out.
- Run user acceptance with your key users. A written plan, flow by flow: quote, invoice, Peppol sending, online order, reports, website pages. Each issue is fixed, then tested again.
- Choose the timing. A quiet period, away from closing and VAT returns, with your key users present. For a webshop, avoid the end-of-year holidays.
- Switch, then follow up. The database is unavailable during the production upgrade. Check the key flows again right after, then watch the website and Search Console.
The full plan (test matrix, go or no-go criteria, checklist by hosting type) is in our white paper "Moving to Odoo 20", free to download.
When should you call an Odoo partner for the upgrade?
A standard database on Odoo Online often upgrades well with a good internal test. A partner becomes useful as soon as there are modules to port, third-party apps, a website that brings clients or a team with no time to test. For full support (audit, test database, fixes, switch, SEO follow-up), see our Odoo 20 migration page.
Project stuck with your integrator? See how to change Odoo partner. To get the most from the new features, an Odoo training session helps your teams; our catalogue presents the Odoo apps. Still unsure? Ask for a free audit of your database.
FAQ
Is Odoo 19 still supported?
Yes. According to Odoo's "Standard and extended support" page (read on 26 November 2026), Odoo 19.0 is under standard support until September 2028, a date given as planned. During that period, the version receives bug fixes and security updates on Odoo Online, Odoo.sh and on-premise. Staying on Odoo 19 today is therefore not a risk.
Will Odoo Online upgrade my database to Odoo 20 automatically?
Yes, sooner or later. According to Odoo's documentation, a database on a major version must be upgraded every two years, and a database on an intermediate version (19.1 to 19.4) a few weeks after the next version is released. Odoo notifies you in the database a few weeks before the due date, then triggers the upgrade if nothing is done.
Can you go straight from Odoo 17 to Odoo 20?
Yes. Odoo's documentation allows an upgrade from any version to a major version still under standard support, so to Odoo 20. Odoo also notes that the smaller the version gap, the easier the upgrade: a jump of three versions calls for more checks on custom modules, reports and automations.
Will my custom modules work on Odoo 20?
Not on their own. According to Odoo, a database that contains custom modules cannot be upgraded until a compatible version of those modules exists for the target version. Odoo's upgrade service covers standard apps and Studio customisations, not in-house or third-party modules without a maintenance contract. Each module must be ported, replaced or dropped.
Do you need Odoo 20 for Peppol in Belgium?
No. Structured e-invoicing has been mandatory between Belgian VAT-registered businesses since 1 January 2026, and Odoo 19 already sends and receives invoices through Peppol. The Odoo 20 release notes add GLN identifiers for Peppol, stating that they are available from version 17.0. Peppol alone is therefore not a reason to upgrade.
Can you go back to Odoo 19 after the upgrade?
On Odoo Online, no: according to Odoo's documentation, you cannot return to the previous version once the production upgrade is completed. On Odoo.sh, the platform reverts the upgrade if it fails and keeps a pre-upgrade backup. The real safety net is therefore prepared beforehand: test database, written acceptance test and a chosen date.
Sources
- Odoo, documentation, Standard and extended support, read on 26/11/2026: https://www.odoo.com/documentation/master/administration/standard_extended_support.html
- Odoo, documentation 20.0, Upgrade, read on 26/11/2026: https://www.odoo.com/documentation/20.0/administration/upgrade.html
- Odoo, Odoo 20 Release Notes, September 2026, read on 26/11/2026: https://www.odoo.com/odoo-20-release-notes
- Odoo, Odoo 19 Release Notes, September 2025: https://www.odoo.com/odoo-19-release-notes
- FPS Finance, e-Invoicing (obligation from 1 January 2026): https://efacture.belgium.be/en